Fifteen-floor vertical expansion and four-story infill.
MAJOR CHALLENGE:
The aggressive schedule along with limited site usage created a scenario where the four-story east infill had to be built at the same time as the 15-story Hotel. The challenge here was that the tower crane and main loading area for the hotel had to be located in the center of the east infill creating a “hole” in the infill that couldn’t be closed up until the project was nearing completion. A large crew along with some overtime was able to make it happen.
ADDITIONAL INFORMATION
Location:
Milwaukee, WI
Scope of Contract:
Interior and Exterior Framing, Drywall, Fireproofing, Rough Carpentry, and USG Ensemble