Uline
ULINE I-6 Kenosha, WI DESCRIPTION OF PROJECT: Warehouse and office facility. MAJOR CHALLENGE: Many changes, extremely high cleaning standards and level 5 throughout. ADDITIONAL INFORMATION Location: Kenosha, WI Scope of Contract: CFMF, CFMT, Non-structural Metal Framing, Gypsum Board Assemblies and DEFS Architect: HGA General Contractor: Hunzinger Construction Company OTHER PROJECTS VIEW ALL PROJECTS
Bayshore Renovation
BAYSHORE RENOVATION Glendale, WI DESCRIPTION OF PROJECT: Bayshore Mall is a large open-air shopping mall/mixed use complex consisting of over a dozen buildings including retail shops, restaurants, offices and residential units with a combined total retail floor area of 1,300,000 square feet. The renovation project included separating buildings, adding roads, reconfiguring parking, building structures, adding […]
Shooting Star Casino
SHOOTING STAR CASINO Bagley, MN DESCRIPTION OF PROJECT: A 21,400 square-foot building with 180 slot machines, dining facility and bar, located between Bagley and Ebro. MAJOR CHALLENGE: Schedule for Exterior work ADDITIONAL INFORMATION Location: Bagley, MN Scope of Contract: Exterior Framing & Sheathing, Interior Framing, Drywall and Taping Architect: Cunningham Group General Contractor: Loeffler Construction […]
Gustavus Anderson Hall
GUSTAVUS ANDERSON HALL St. Peter, MN DESCRIPTION OF PROJECT: A complete renovation of the existing Anderson Hall on the campus of Gustavus Adolphus College. MAJOR CHALLENGE: Working through existing conditions while achieving a high level of finish and maintaining the schedule while portions of the roof were being replaced. ADDITIONAL INFORMATION Location: St. Peter, MN […]
Port Washington High School
PORT WASHINGTON HIGH SCHOOL Port Washington, WI DESCRIPTION OF PROJECT: Exterior framing and sheathing and interior gypsum board assemblies for a three-story academic addition and an addition of a cafeteria, gymnasium and offices. Renovation of existing school in many separate areas completed over 11 phases including gypsum board assemblies. MAJOR CHALLENGE: Three-story academic addition built […]