Oporo Center for Special Surgery

OPORO CENTER FOR SPECIAL SURGERY West Fargo, ND DESCRIPTION OF PROJECT: Oporo is part of a new medical campus that will include multiple clinics, onsite pharmacy, and an ambulatory surgery center. Olympic started exterior framing/sheathing in the winter of 2022 with the interior scope of framing, drywall, and taping continuing through the remainder of 2022. […]

Dickson Hollow Senior Housing

DICKSON HOLLOW SENIOR HOUSING Menomonee Falls, WI DESCRIPTION OF PROJECT: Assisted living center receiving cold-form metal framing and cold-formed metal joist.       MAJOR CHALLENGE: It had an aggressive schedule. This load-bearing project had a high degree of difficulty, but with pre-planning the project went smoothly. ADDITIONAL INFORMATION Location: Menomonee Falls, WI Scope of Contract: Cold-Formed Metal […]

Brookings County Detention Center

BROOKINGS COUNTY DETENTION CENTER Brookings, SD DESCRIPTION OF PROJECT: 19,200 square feet of new construction and 4,800 square feet of remodel.             It includes the construction of general housing for 84 adult inmate beds, temporary housing for juvenile offenders, a kitchen, recreation room space, and two safe rooms to house individuals in protective custody. The facility […]

Raven Precision Agricultural Center

RAVEN PRECISION AGRICULTURAL CENTER Brookings, SD DESCRIPTION OF PROJECT: Two-story 126,000 square-foot building with classrooms and laboratories. The exterior framing was a good challenge for the crew because the windows didn’t stack in this two-story design like they typically do in other projects where they can share a jamb stud. This unique design called for […]

FedEx Ground

FEDEX GROUND Sioux Falls, SD DESCRIPTION OF PROJECT: 340,000 square-foot Distribution Center, Offices, Manufacturing Facility that was built in the industrial area. We framed up a total of 110 doorways to meet the requirements of the industrial loading doors and vehicle sizes. The office areas at one end of the building needed walls as high […]